日韩精品人妻系列无码专区,久久久久人妻精品一区二区三区,亚洲av无码专区在线电影,亚洲av综合永久无码精品天堂

Welcome to zhongying water supply Hunan, China Website
Your Position: Home > Experts > Service Center

How to prolong the service life of non negative pressure water supply equipment

2017/2/28??????view:

How to prolong the service life of non negative pressure water supply equipment


    As everyone knows, the water pump is used as the core component of non negative pressure water supply equipment, is the key to non negative pressure water supply equipment can operate normally, in addition to the principle of centrifugal pump related knowledge, we have more important is how to conduct the related maintenance of our water pump, to prolong the service life of the water pump non negative pressure water supply equipment, from below the following details should pay attention to what matters to prolong the service life of the water pump.
Preparation of non negative pressure water supply equipment before starting:
1, test motor steering is correct, from the top of the motor to the pump as a clockwise rotation, the test time should be short so as to avoid mechanical seal dry wear.
2, open the exhaust valve to fill the entire pump body, to be closed after the exhaust valve.
3, check each part is normal.
4, with the hand disc pump to make the lubricating liquid into the mechanical seal face.
5, the high temperature type should first run preheating, heating rate of 50 C / h, in order to ensure that each department is heated evenly.
Non negative pressure water supply equipment start:
1, fully open inlet valve.
2. Close the valve.
3, start motor, observe whether the pump is running correctly.
4, adjusting the outlet valve opening to the desired condition, such as the user is equipped with flow or pressure meter at the outlet of the pump, it should adjust the outlet valve opening in the pump performance parameter table rated point operation, if the user is not installed in the pump outlet flow or pressure meter, it should adjust the outlet valve opening; the motor current measuring pump, the motor runs in the rated current, otherwise it will cause the pump overload operation (i.e. current operation, to make the motor burned out) adjustable outlet valve opening is large and small and pipeline related conditions.
5, check the seal leakage, normal mechanical seal leakage should be less than 3 drops per minute.
6, check the motor, bearing temperature rise at less than 70 DEG C.
Non negative pressure water supply equipment shutdown:
1, high temperature before cooling, the cooling rate is not higher than 10 deg / min, the temperature is lowered to below 80 DEG C, to stop.
2. Close the valve.
3, stop motor.
4, close the inlet and outlet valve.
5, such as long-term shutdown, the pump should be put into the liquid.
Through the above several operations related to the maintenance, I believe the pump service life will be greatly extended, better play its due function.







Name: *
tel: *
Question: *
leave your message
圖片看不清?點擊重新得到驗證碼
无码性午夜视频在线观看| 超碰人人模人人爽人人喊手机版| 国外亚洲成av人片在线观看| 日本五月天婷久久网站| 欧美日韩国产精品自在自线| 久久久久99精品国产片| 国产av无码专区亚洲avjulia| 亚洲免费人成在线视频观看| 黄a大片av永久免费| 麻豆精产国品一二三产区| 无码国产精品一区二区高潮| 真人祼交二十三式视频| 亚洲 自拍 另类小说综合图区| 久久中文字幕人妻熟av女蜜柚m| 国产办公室沙发系列高清| 大ji巴好深好爽又大又粗视频| 成人午夜特黄aaaaa片男男| 精品欧美一区二区在线观看| a级黑人大硬长爽猛出猛进| 无码熟妇人妻av在线网站| 中国女人做爰视频| 亚洲av无码乱观看明星换脸va| 亚洲日韩乱码中文字幕| 亚洲欧洲日本综合aⅴ在线| 亚洲国产精品第一区二区三区| 少妇高潮无套内谢麻豆传| 久久精品国产亚洲av高清漫画| 手机福利视频| 乌克兰少妇xxxx做受| 欧美激情视频一区二区三区免费| 67194成l人在线观看线路无码| 好男人www免费高清视频在线观看| 亚洲综合区图片小说区| 国产精品a免费一区久久电影| 最新亚洲精品国偷自产在线| 综合 欧美 亚洲日本| 热久久美女精品天天吊色| 国产六月婷婷爱在线观看| 三级全黄的视频在线观看| av无码精品一区二区三区宅噜噜| 日日摸夜夜添狠狠添欧美|